Our Success Stories

Background

Fatmawati Central General Hospital (RSUP Fatmawati) is a national referral hospital in Indonesia, known for its commitment to delivering high-quality healthcare services. With the increasing need for fast, stable data access to support electronic medical records, telemedicine, and internal system integration, Fatmawati Hospital aimed to upgrade its IT infrastructure by implementing a modern Fiber Optic (FO) network.

Challenges

  • Limited speed and stability of the previous copper-based network

  • Delays in accessing patient data across wards and departments

  • A growing need for a network capable of supporting full digital transformation hospital-wide

Solution by PT. Uri Citra Mulia

PT. Uri Citra Mulia delivered a complete, future-ready fiber optic solution, including:

  • Design and installation of Fiber Optic cabling throughout the hospital

  • Deployment of reliable, high-quality products from Panduit, Ruijie, Netviel, and DCN

  • Comprehensive testing and documentation for certification

  • Basic technical training for Fatmawati’s internal IT team

Results Achieved

  • 10x improvement in network speed

  • Real-time access to electronic medical records across departments

  • Stable, scalable infrastructure supporting digital innovations such as telemedicine, integrated CCTV systems, and online queuing

  • Secure, future-proof foundation ready to meet increasing data demands

Partnering for the Future

PT. Uri Citra Mulia is proud to be part of Fatmawati Hospital’s digital transformation. We remain committed to delivering top-tier technology solutions for the healthcare sector and beyond.

Are you ready to upgrade your network infrastructure with a reliable, future-proof solution?
Contact PT. Uri Citra Mulia today to learn how we can support your organization with expert planning, installation, and ongoing support tailored to your needs.

Enhances Digital Services with Fiber Optic Infrastructure

Background

Astra Infra, a leading player in Indonesia’s infrastructure sector, required a high-speed and reliable data communication system to support its operations across multiple strategic locations. To ensure smooth data flow, real-time monitoring, and robust network stability, a transition to a fiber optic-based network infrastructure became essential.

Challenges

The project presented several challenges, including:

  • Complex site conditions due to ongoing infrastructure activities.

  • Strict safety and operational standards of Astra Infra.

  • The need for minimal disruption to daily operations during installation.

  • Integration with existing network infrastructure.

Solution by PT. Uri Citra Mulia

URI Citra Mulia responded with a strategic and methodical approach. Our team conducted an in-depth site survey, followed by a customized installation plan tailored to Astra Infra's operational and technical requirements. Key steps included:

  • Deploying high-quality fiber optic cables to ensure long-term durability and optimal performance.

  • Installing active devices and network components to maximize bandwidth usage.

  • Coordinating with Astra Infra teams to ensure safety compliance and minimal interference with daily operations.

  • Providing post-installation support and network testing to guarantee system reliability.

Results Achieved

The project was successfully completed on time and within budget, delivering measurable benefits to Astra Infra, such as:

  • Enhanced network speed and stability.

  • Improved operational efficiency through seamless data transmission.

  • Future-ready infrastructure capable of supporting growth and digital innovation.

  • Strengthened collaboration between URI Citra Mulia and Astra Infra, reinforcing trust and technical reliability.

Partnering for the Future

This project reflects URI Citra Mulia’s commitment to delivering high-quality ICT infrastructure solutions, even in complex and demanding environments. Our ability to plan, execute, and support critical installations ensures our clients are always equipped with the tools they need to succeed in a connected world.

Are you ready to upgrade your network infrastructure with a reliable, future-proof solution?
Contact PT. Uri Citra Mulia today to learn how we can support your organization with expert planning, installation, and ongoing support tailored to your needs.

Fiber Optic Cable Installation

Background

Badan POM, Indonesia’s National Agency of Drug and Food Control, plays a vital role in safeguarding public health. To support its day-to-day operations and nationwide digital services, a stable and well-maintained IT infrastructure is critical. With a vast network of offices and systems, Badan POM required a reliable partner to ensure uninterrupted performance of its computers, data centers, and network infrastructure.

Challenges

Maintaining such a large-scale IT environment presented several challenges:

  • Managing maintenance for hundreds of computers across multiple departments and locations.

  • Ensuring uptime and performance of mission-critical data centers.

  • Monitoring and troubleshooting network infrastructure to prevent downtime.

  • Coordinating support while minimizing disruption to daily operations.

Solution by PT. Uri Citra Mulia

PT. Uri Citra Mulia delivered a structured and responsive maintenance program tailored to Badan POM’s operational needs. Our approach included:

  • Scheduled preventive maintenance for hardware and software components.

  • 24/7 support and rapid response for critical incidents.

  • Continuous monitoring of data center performance and environmental controls.

  • Routine health checks and optimization of network infrastructure.

  • Deployment of experienced technicians onsite and remote support for extended coverage.

Results Achieved

Our partnership with Badan POM delivered tangible benefits, including:

  • Increased uptime and reliability of all critical IT systems.

  • Faster incident resolution and reduced technical downtime.

  • Improved performance and lifespan of computing and networking assets.

  • Enhanced confidence from internal users due to consistent IT support.

  • Greater operational efficiency across departments.

Partnering for the Future

This successful collaboration highlights URI Citra Mulia’s strength in managing complex IT environments with professionalism, precision, and commitment to excellence. We continue to support institutions like Badan POM in achieving their digital transformation goals through dependable maintenance services.

Is your organization seeking a trusted partner to maintain and optimize your IT infrastructure?
Contact PT. Uri Citra Mulia today to explore how our expert maintenance solutions can keep your systems running efficiently and securely—every day.

Comprehensive IT Maintenance at Badan POM

Background

JLB, an essential government agency supporting infrastructure and public services, aimed to upgrade its internal connectivity and security systems. To support their expanding operational needs and enhance surveillance capabilities, the organization required a robust and future-proof infrastructure—combining high-speed connectivity with reliable monitoring systems.

Challenges

The project came with several key challenges:

  • The need for seamless integration with existing infrastructure.

  • Strict timelines and operational continuity—work had to be performed without disrupting ongoing activities.

  • High-performance requirements for both data transmission and security systems.

  • Coverage across multiple buildings and locations.

Solution by PT. Uri Citra Mulia

PT. Uri Citra Mulia developed a comprehensive and tailored implementation plan to meet the demands of JLB. Our solution included:

  • Installing high-quality fiber optic cables to ensure stable, high-speed data communication.

  • Deploying active network devices such as switches, routers, and access points to optimize network performance.

  • Setting up a CCTV system across key areas for enhanced security monitoring.

  • Conducting integration with existing IT infrastructure to ensure seamless operation.

  • Providing training and post-installation support to the internal IT team.

Results Achieved

The project was executed successfully, meeting both timeline and performance expectations. Key outcomes included:

  • Significantly improved data transmission speed and network reliability.

  • Strengthened physical security with real-time surveillance capabilities.

  • Increased efficiency in IT operations and interdepartmental communication.

  • Minimal downtime during installation due to precise planning and coordination.

  • Positive feedback from internal stakeholders on the performance and usability of the new system.

This successful deployment showcases PT. Uri Citra Mulia’s ability to deliver complex infrastructure projects with precision, quality, and client-centric service. Our team continues to support government institutions like JLB in building secure, connected, and future-ready environments.

Looking to enhance your organization's network and security infrastructure?
Contact PT. Uri Citra Mulia today to find out how we can help you implement high-performance, scalable, and secure solutions tailored to your needs.

Installation of Fiber Optic Cables, Active Devices, and CCTV